Overview
PreFlight — Deterministic Upstream Data Ingestion Gate
Definition
PreFlight is a deterministic upstream ingestion enforcement engine.
It evaluates mechanically provable structural ingestion risk prior to downstream execution and issues a fixed verdict.
PreFlight declares ingestion state only.
Execution authority remains external.
System Position
PreFlight operates between dataset acquisition and downstream environments.
- Executes after data production or export
- Executes before ingestion into storage, analytics, or model systems
No execution occurs inside downstream systems.
PRE-FLIGHT SYSTEM POSITION — v1.01
Role:
Deterministic upstream ingestion enforcement engine.
Placement:
Dataset Acquisition
│
▼
PreFlight Deterministic Boundary
│
├── PASS → Downstream execution permitted
├── WARN → Downstream execution permitted with exposure
├── BLOCK → Downstream execution not recommended
└── ANALYSIS_INCOMPLETE → Admission not proven
│
▼
Downstream Systems
(Storage / Warehouse / Analytics / Models)
Execution Properties:
• Fixed execution order
• Mechanical verdict reduction
• No probabilistic logic
• No adaptive behavior
• No semantic interpretation
Deterministic Verdict Boundary
Each evaluation reduces mechanically to one of four outcomes:
- PASS
- WARN
- BLOCK
- ANALYSIS_INCOMPLETE
- No scoring
- No heuristics
- No probabilistic logic
- No adaptive behavior
Identical inputs yield identical outcomes.
Problem Class
Ingestion defects can propagate silently.
- Data loads
- Systems execute
- Outputs appear plausible
- Structural faults persist
PreFlight exists to expose ingestion risk before downstream execution begins.
Structural Evaluation Domain
Evaluation is limited to mechanically observable ingestion properties:
- Schema structural integrity
- Row traversal viability
- Numeric type stability
- Representation consistency
- Null density behavior
- Record continuity
- Encoding determinism
No semantic interpretation.
No business validation.
No transformation or remediation.
Evaluability Rule
Ingestion safety must be mechanically verifiable.
If structural evidence is insufficient under deterministic execution rules, ANALYSIS_INCOMPLETE is issued.
Absence of proof does not reduce to PASS.
Scope Constraint
PreFlight governs ingestion safety only.
It does not:
- Modify datasets
- Orchestrate workflows
- Infer intent
- Score quality
- Perform semantic validation
Function is enforcement — not governance.
System Posture
- Upstream
- Deterministic
- Mechanical
- Auditable
- Non-interactive
- Conservative by design